@matigo It’s on a lot of wheels. And its 558 tonnes, not 538 as previously stated.
There’s a very oversized load passing through the area very slowly. It moves at 20 km/h, is 108 metre long and weighs in at 538 tonnes.
I found where it’s currently parked before heading off on the 2nd stage of the journey at 10pm tonight but I can’t get close enough for photo opportunities as I have to park illegally on the side of the freeway.
The freeway will be closed between 10pm today & ttomorrow to facilitate its movement as it’s too wide for traffic to overtake.
@hazardwarning When we see colours like that on a map, it's an indication of where the wildfires are.
They're closing the nearby freeway at tonight for 7 hours as A massive 108m load on the move from the docks to a regional power station.
The section the load will traverse over that period can normally be done by car in 45 minutes.
https://www.vicroads.vic.gov.au/newsmedia/2018/a-massive-108m-load-on-the-move-in-may
Just spotted this on Twitter, by our old mate @height8: https://twitter.com/height8/status/1000234857342087168
Successfully showered while keeping dressing dry, covered it with a waterproof but breathable dressing film.
A plumber will be digging up my back yard on Monday or Tuesday to try to work out where the sewer leak is located. There is likely to be a blockage in the line somewhere but it's not obvious where.
I don't need this shit.
It’s a lot of bother, having to keep this area as dry as possible for two weeks while sutured and for another week after suture removal. And if the biopsy shows something nasty, then I probably won’t cope very well at all.